All
Case Studies
Geotechnical Instrumentation Monitoring
Instrumentation DAM monitoring
Real Time and Wireless monitoring Solution
Structural Health Monitoring (SHM)
Sardar Sarovar Dam Rehabilitation Project
Rehabilitation of the dam and transition from manual to automatic monitoring.
Piz Nair – Monitoring the stability of the rock mass
Additional monitoring instruments at Kariba Dam rehabilitation project
Kariba Dam Rehabilitation Project
Additional monitoring instruments at Kariba Dam rehabilitation project
Steinbruch Rotzloch, Stansstad
Monitoring the stability of a rock cliff on a Swiss road and rail route.
Switzerland, Berne Access tunnel Railway Station
RBS access tunnel Berne railway station, struts force measurement in excavation pit.
Weggis, Spare Rock Wall
The Spare Nagelfluh rock wall is located above the busy connecting road between Weggis and Vitznau, which runs along Lake Lucerne in Switzerland.
Load More