Case Studies

  • Home
  • Case Studies Grid Originale
All Case Studies Geotechnical Instrumentation Monitoring Instrumentation DAM monitoring Real Time and Wireless monitoring Solution Structural Health Monitoring (SHM)

Sardar Sarovar Dam Rehabilitation Project

Rehabilitation of the dam and transition from manual to automatic monitoring.

Piz Nair – Monitoring the stability of the rock mass

Additional monitoring instruments at Kariba Dam rehabilitation project

Kariba Dam Rehabilitation Project

Additional monitoring instruments at Kariba Dam rehabilitation project

Steinbruch Rotzloch, Stansstad

Monitoring the stability of a rock cliff on a Swiss road and rail route.

Switzerland, Berne Access tunnel Railway Station

RBS access tunnel Berne railway station, struts force measurement in excavation pit.

Weggis, Spare Rock Wall

The Spare Nagelfluh rock wall is located above the busy connecting road between Weggis and Vitznau, which runs along Lake Lucerne in Switzerland.
Load More